Latest project: cabin on 5 acres in the woods. Exterior, interior framing, electric wiring done prior. Big items: central AC (contractor), plumbing, tongue in groove walls and ceiling, all fixtures and appliances, complete bathroom, flooring, etc. (us w a couple hired guns when manpower needed) Looking to finish structure by end of year for purpose built ABB.
Then to the outside for the entertainment: hot tub/volleyball/fire pit/etc and finish a remote boom boom room/kid’s hideout with electric/AC and accommodations. As an aside, found what looks to be bear scat all around this area.